Kirama Turn-Key Water Treatment Project

Kirama-Katuwana integrated water supply scheme including 3.500m³/day capacity water treatment plant, raw water intake, located in lake Warapitiya, 1700 meter raw water pipes, 6.000 meter treated water pipes and 47.000 meter distribution network pipes.

Sufficient raw water is available to meet the requirements of the Treatment Plant.

Electricity

The Project will receive the electricity from the national grid. Additional two separate stand-by generator sets are provided by the Project for RW Intake & WTP.

Operation and Maintenance

NWSDB (National Water Supply and Drainage Board) has their own staff for operation and maintenance of water treatment plants. The NWSDB is successful operating similar plants throughout the country. The Project will also provide a master tailored training program for the operators of the treatment plant and Kirama-Katuwana water supply scheme respectively.

Training and technical assistance program is an integral part of the project. The objective of the training and technical assistance program is to secure a proper project implementation and after commissioning of the water treatment plant the full utilization of the project and to guarantee the long lasting benefit for the population of Sri Lanka.

More Case Studies

Process Simulation for the Selection of Complex Industrial Water Treatment Processes

In June this year, the WIN 2026 (Water in Industry) conference hosted by the Internation Water Association took place in ...

General view of the UNIHA pilot water treatment plant in Gilău, Romania.

Advancing Water Innovation in Romania

UNIHA Wasser Technologie GmbH has successfully delivered and commissioned a pilot water treatment plant in Gilău, Romania, as part of ...

Zero Liquid Discharge

Many industrial plants are facing increasingly limited options for wastewater discharge. Stricter environmental regulations and rising disposal costs are making ...

Let’s talk about Your Project